New Medlock House, Manchester

HG were appointed to carry out the m&e design for the refurbishment scheme of this 690 bed student accommodation building.
The scheme involved a full redevelopment of the existing domestic water system to facilitate the introduction of an ASHP installation to replace the existing electric only installation. Modular plantrooms were designed and developed with full designs being provided by HG.
In addition full ventilation replacement designs were provided throughout the accommodation as well as the design of new amenity spaces.
Energy assessment and analysis was carried out by HG

COMPLETION DATE

2025

SECTOR

Residential

TYPE

New Build

CLIENT

Fortis Vision

Lorem ipsum is simply dummy text

Lorem ipsum is simply dummy text 2

Lorem ipsum is simply dummy text 3

Achieving real results for our clients

40% average reduction in CO₂ emissions across recent schemes

More than 8,500 homes supported with MEP design

£1.2 million in lifecycle cost savings delivered for residential clients

Over 120 residential projects completed across the UK

A great company to work with

 

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

JOHN SMITH

Company A

We transformed this client’s building efficiency. Let’s see how we can help you.

With over 20 years of experience in delivering smart, efficient engineering solutions, HG Consulting Engineers is ready to help you achieve your goals. Whether it’s a new build, refurbishment, or optimisation project, our team is here to provide expert guidance every step of the way.

Contact form

    Contact Us